Understanding New House Building steps for a new house

1 Choose your new home site
When visiting a site in your new home building, select the site using a general contractor, real estate brokers, architect or engineer.

2 Have Your Designer Design Your House Plans
The team of architects to develop plans of your house to match state and local regulations.

3 Review House Plans
architect review plans of housing construction and appointments with customers.

4th Obtain permits /> The architect or builder applies for building permits

5 Clearing /> The blade construction equipment to clear the land of trees, shrubs and brush and a path for Your home site created.

6 Layout House
A general contractor or engineer to the original location set.

7 installation of septic tanks, wells and other utilities Begins
Utility installation often starts now, even if your project coordinator, these positions leave the end of the construction.

Excavation 8
shovels and heavy equipment to start the excavations around the country prepare for basics.

9 house Soles
The general contractor or mason poured his footing. In areas inhabited heavy foot your contractor to a subcontractor of the contractor foundation wall can be.

9 foundation walls
Two common types of foundation walls are block foundation and poured concrete foundation walls. Its concrete floor is usually paid after the removal of the formwork for foundation walls.

10 Back charge
The backhoe filled are cast to the ground. Some business owners prefer solid ground to tie bar before returning filling the walls together.

11 House floor framing
carpenters or senior Crew Development of the ceiling beams and the application of the apron, the ceiling beams.

12 Wall Framing
carpenters build exterior walls or author. The interior walls are often built in this phase, although the inner walls built after the roof be designed.

13 Frames
The carpenter set the stage for the roof coating. The walls can also be wrapped at this point, if they are not covered during the preparation of the wall. Rakes and decorative panels can be added at this stage if we wanted a little extra style to your home.

14 Supervision Inspection
your building inspector reviewed all records of the construction there. Make sure the test plan with your local building inspector review, as there are many additional checks before, which may be required.

15 is used for roofing
When the house ready for roofing, general contractor or the roofing shingles. Asphalt shingles, fiberglass, cedar and slate shingles are the options in metal and metal panels and more popular.

16 windows and exterior doors Install
Carpenters now install your windows and exterior doors. If you want to go in, with a external (hard) on the insulation R-value of your home, it will be installed after the installation of windows and exterior doors.

17 install siding
The coating manufacturer or contractor is now the siding for your new home. the most popular options vinyl, aluminum and cedar siding are. After installation of vinyl siding and cedar shake siding, add a decorative gable style is more popular.

18 HVAC work
HVAC (heating, ventilation and air conditioning) is now installed. In some areas of the HVAC contractor the same as the plumber.

19 heating
At this stage of the process of building the plumber installed the heating.

20 power
The electrician is now installing the majority of electrical work, including the circuit breaker panel, and cable boxes.

21 insulation
The insulation contractor or general contractor insulated the walls. The ceiling is remote areas where there are no arched attic access to this area. The ceiling is the most frequently isolated after step plasterboard with blown insulation.

22 Install Drywall
A contractor who can plaster your general contractor is now installing your drywall. Drywall is also commonly known as gypsum board or plasterboard.

23 Drywall Finishing
plasterers tape the joints with grout is installed after the drywall. Then, the additional up to 2 layers of joint compound are on the ball and the corner strip.

24 can Paint
Mural to be achieved at this stage, or completed after the final trim installation.

25 Cabinet Trim and finish the installation
The carpenter will install cabinets and baseboard trim and window frames. Trim remain popular in the halls of the kitchen and dining room.

26 Installation Floor
There are many popular types of flooring to choose from. After a variety of styles finished floor is very common with the styles, including laminate, vinyl, wood and tile floor.

27 pre-heating
The finish heating includes setting the sink, bathroom fittings, showers, bathtubs and toilets.

28 Finish Electric
The electrician performs the electrical supply at that time, including installation of outlets, switches and lights.

Done CAC 29
The faceplates are now installed on the Register and in the air again in the HVAC system. If the house is installed in your house on your HVAC contractor often breeding grounds, whose bid for the work of the CAC.

30 final concrete work
The last driveway and concrete work including sidewalks, optional porch concrete garage floor pads and whirlpools.

Deck 31
Deck construction is now performed by the prime contractor. Spas are often built into the design of the bridge. Be sure to discuss the possible creation of a hot tub on the deck with your contractor, the enormous weight of coaching requires additional provisions.

32 Landscape
landscape shrubs and trees and plants add grass or grass for your new lawn the finishing touches.